PILING COMPLETE AT BLACKPOOL

Piling is now complete at the Hampton By Hilton site in Blackpool. Groundwork has commenced with Pile Caps & Groundbeams, ready to received Steel Frame on the 13th of. April.

Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square